Mold is one of the nightmares which no property owner wants to deal with. But there is no need to worry anymore! Mold remediation in Long Island NY is now possible. You can call a professional company for the same and get the job done.
How Mold Thrives?
Mold spores are always present in the air, and all they require is food, water, and heat to bloom into a problem. Mold will eat everything made of organic stuff, including drywall and ceiling tiles, which is bad news for you.
The presence of organic material during early construction is limited, especially if the flooring is concrete and the framework is metal. Due to the hardness of the material, even wood framing and subfloors can be difficult for mold to colonize in the brief time they are exposed. On the other hand, Wood can grow mold if left exposed for an extended period of time. Drywall and ceiling tiles, on the other hand, are especially susceptible to mold due to the soft organic matter that makes them up. Mold can start growing on certain materials within 48-72 hours of first getting wet.
How Can Mold Be Prevented During Construction?
It’s as simple as keeping vulnerable materials dry to prevent mold growth during construction. In reality, this implies that your construction company must focus on three key areas:
Before putting drywall or installing ceilings, “dry-in” the structure. The term “drying-in” refers to the act of sealing the building envelope to prevent water from penetrating the interior. Installing a water-tight roof, outside siding, windows, seals around windows, and other openings is part of this process.
Before you start drying in, make sure any wet things are completely dry. After a rain event, wood subfloors and framing can trap moisture and release it back into the indoor environment after drying in, which can be absorbed by drywall and promote mold growth. This can be avoided by giving these materials plenty of time and space to dry before putting them in.
During construction, eliminate or remediate additional sources of humidity. Even if a building has been thoroughly dried, mold can form if excessive moisture is brought into the structure. This is particularly common when a structure is being renovated and asbestos or the drywall needs to be removed. Water is used to manage dust in these procedures, and dehumidifiers may be required during the construction phase.
What to Look for, and When
Add moisture to your inspection checklist during walk-throughs to verify your mold removal company in Long Island is doing everything possible to avoid costly mold concerns. Specifically:
Prior to the installation of the drywall. Before starting this project, make sure the building envelope is sealed tight–that is, the roof, external siding, and windows are all installed and that all gaps are sealed. Also, make sure that any wet wood or other materials have been allowed to dry out first.
During and after the demolition. Check that sufficient dehumidification is used during the removal of asbestos and drywall, both of which consume a lot of water. Any excess water is removed before new materials are put in if your project is restored. It is important to keep the relative humidity below 60%.
New York Mold Specialist is the best bet for you if you are looking for mold removal or remediation. Contact now!